  1. 1Select A1:B7, the steps and amounts with the headings.
  2. 2Insert › Insert Waterfall, Funnel, Stock, Surface, or Radar Chart › Waterfall.
  3. 3Click the Closing bar, then click it again so only it is selected. Right-click › Set as Total.

A Waterfall chart shows how a starting amount rises and falls step by step to an end amount. Negative amounts step down, positive ones up. A closing balance must be set as a total, or Excel stacks it on top of everything as one more increase.

What the MO-211 task asks

Waterfall is in more of our MO-211 practice exams than any other new chart type. The task names the chart and the title, then the bar to fix: “Build a Waterfall chart from A3:B10 to tell the fund's story for the year, title it Restoration Fund Walk, and set the Closing fund bar as a Total.”

Some tasks ask for two totals, such as a subtotal part-way and the closing balance. The grader reads which points are set as totals from the saved chart, so each one has to be set.

Worked examples

Set up the grid below to follow along. Each example starts from it as shown; every result is what Excel showed.

Sheet Cash
AB
1StepAmount
2Opening5000
3Sales3200
4Refunds-400
5Wages-1800
6Rent-900
7Closing5100
Insert the waterfall
Do this
  1. 1Select A1:B7.
  2. 2Insert › Insert Waterfall, Funnel, Stock, Surface, or Radar Chart › Waterfall.
Excel showsSales steps up · Refunds, Wages and Rent step down · Closing floats on top, up to 10200

Until you say otherwise, every amount is a step. Closing is added to the running 5100 like any other increase.

Set Closing as a total
Do this
  1. 1Click the Closing bar, then click it again.
  2. 2Right-click it › Set as Total.
Excel showsClosing stands on the axis, 0 to 5100, in the Total colour

A total bar starts from zero. 5000 + 3200 − 400 − 1800 − 900 is 5100, so the closing bar now ends level with the last step.

The same in the pane
Do this
  1. 1Select only the Closing bar › Format Selection.
  2. 2Series Options: tick Set as total.
Excel showsThe same total bar

Set as Total on the menu ticks this box. Untick it to make the bar a step again.

A decrease typed as a positive number
Do this
  1. 1Change B4 from -400 to 400.
Excel showsRefunds steps up, and Rent now ends at 5900, 800 above the Closing total of 5100

The waterfall takes the sign from the cell. A cost has to be negative to step down, or the steps no longer meet the total.

In the video
Do this
  1. 1Select A1:B7 › Insert › Waterfall.
  2. 2Click Closing twice, right-click › Set as Total.
Excel showsClosing drawn from zero as a total

The first two examples, done in Excel on this sheet.

Watch it done in Excel

The last example above, recorded in real Excel on the same grid.

Exam traps

Setting the whole series as a total

One click on a bar selects every bar. Set as Total appears only for a single point, so click the bar a second time before you right-click.

Leaving the closing balance as a step

Without Set as Total, the chart looks finished but the closing bar floats from 5100 up to 10200. A task that asks for a total checks the setting itself.

Setting only one of two totals

When a task names two bars, such as a subtotal and the closing balance, set each of them. They are separate points.

FAQ

Does the opening amount need to be set as a total?

Only when the task asks. As the first point it starts from zero either way; set as a total, it changes to the Total colour.

What does the legend show?

Increase, Decrease and Total, the three colours of the bars. Total is listed even before any bar is set as one.

Can I build a waterfall with older Excel?

The Waterfall chart type needs Excel 2016 or later. In older versions it was a stacked column with a hidden base; MO-211 asks for the real chart type.

Try it under exam conditions

Take a full, timed MO-211 practice exam, upload the workbook you built, and get a score out of 1000 with a per-task breakdown of where the points went. Your first one is free.

No credit card needed.